Week in brief
- Radix Wallet for Android 1.22.3, released on 17 November, fixes how versions 1.18.7 to 1.22.2 protected stored seed phrases; anyone on those versions should update, then unlock the wallet and finish Update protection.
- GenkiPool released test builds of the Android wallet and the Connector Extension that link over iroh, without the signaling server.
- Holders are voting until 24 November on the list of 14 candidates for the Permanent RAC; by 22 November it had 532m $XRD for and none against, past its quorum.
- Gary staked 1.37bn of the 1.4bn $XRD bought from RDX with 23 validators; six of them, holding 420m of it, charge a 100% fee.
- No result from the 18 November High Court hearing on RDX Works had been published by 22 November.
- Hyperscale recorded no commits; Milestone 1 of six is done, and flightofthefox gives no timeline for the rest while the hours available are unknown.
- rlyfun, a meme-coin launchpad, reopened at rlyfun.com on 20 November.
On 18 November Ghenadie, who builds the Radix Wallet for Android, asked everyone on versions 1.18.7 to 1.22.2 to update: those versions left the stored seed phrases of some wallets, the words that restore a wallet, open to an attacker who has already compromised the phone or the app. The fix had shipped the day before. The wallet is kept going by volunteers, with bug fixes only.
Most of what moved this week moved that way. A validator operator rebuilt how the wallet links to a browser, the council put its candidate list to a vote, and the $XRD that RDX sold was staked with 23 community validators. hyperscale-rs, the sharded node one developer builds without a grant, took no commits.
The Android wallet's security fix
Version 1.22.3 changes how the app stores and recovers the keys that protect seed phrases kept on the phone (pull request #1456), and ships Sargon 1.2.61, the library both wallet apps share, which fixed that recovery when the phone's key storage is empty. Ghenadie's announcement credits LRB85 with reporting the flaw. Installing the update does not finish the fix for an affected wallet: its owner opens and unlocks it and, if prompted, completes Update protection, with the seed phrases backed up offline first. The announcement names only Android; the iOS app is still 1.22.1.
Radix Connect over iroh
The same evening GenkiPool, a validator operator, published test builds of the Android wallet and of the Connector Extension for Chrome that carry Radix Connect, the link between a phone wallet and a dApp in the browser, over iroh as well as WebRTC. iroh is a peer-to-peer networking library; over it the link no longer depends on the signaling server RDX Works ran, notices a closed wallet in about a second and recovers lost requests itself (genkipool/radix-connect-iroh). The builds are not official releases: GenkiPool asks testers to create a new wallet on Stokenet, Radix's test network, and never to import a main seed phrase. GenkiPool said the builds were held back until the wallet's vulnerability was fixed.
The council's candidate list
The Transition RAC opened Temperature Check 4 at 22:13 UTC on 19 November. Until the same time on 24 November holders vote on whether 14 candidates make an acceptable list for the Permanent RAC, the seven-seat council that will oversee Radix DAO LLC. By 22 November 64 accounts had voted, 532m $XRD for and none against, past the 405m quorum. If the list passes, a seven-day Majority Judgment election opens on it after the result's 48-hour challenge window: every voter grades every candidate, and a candidate can take a seat only if at least three-fifths of the voting power grades them Good or better (Elect the Permanent RAC).
Two of the three Transition RAC members, Tadkis and Mr. Peanutbutter, are on the list, so they are recused from deciding the result; projectShift runs the election with Jazzer9F and Avaunt of the earlier council as advisers, the council said in its update of 19 November.
The handover and the RDX tokens
The same update pointed to the council's signed notice of 13 November declining to take Temperature Check 2, which asked to burn or disable RDX Works' $XRD, to a binding vote (Proposal and Voting Framework has the reasons). The transfer of the Radix Foundation's assets to the DAO is delayed by people's availability on both sides and by operational details, not by a dispute, the council said; it meets the Foundation on 23 November to set a schedule.
HM Revenue & Customs' petition to wind up RDX Works was due before the High Court on 18 November (The London Gazette). By 22 November Companies House still listed the company as active with no new filing, and the Gazette had published nothing since the petition.
Where RDX's tokens went
Gary, the community member who bought 1.4bn $XRD from RDX over the counter on 9 November, published the seven accounts the tokens were split into on 14 November and asked validator operators who needed stake to reply. Between 14 and 21 November those accounts staked 1.37bn $XRD with 23 validators, read from the Radix Gateway's transaction stream. Twenty-two received between 25m and 102m each; REDDICKS NODE, the validator run for the Reddicks memecoin, received 250m in four transactions (the first, 70m).
Staking does not move ownership. Gary holds liquid stake units, tokens that redeem for the $XRD and its rewards, and can unstake at any time (Delegated Proof of Stake). The largest single recipient after REDDICKS NODE is RADIX FAM 3, one of three validators run by Radix Fam, a Telegram group that asked developers on 21 November to join a team its fees pay for. Others went to operators who build on Radix, among them IdeoMaker, GenkiPool and linuxx.
Hyperscale: what is built and what is left
Hyperscale is the sharded form of Radix: the network split into shards that each order their own transactions, so capacity grows as shards are added. flightofthefox builds it in two repositories: hyperscale-rs, the node, and hyperscale-vm, the engine that runs transactions in place of today's Radix Engine. The plan put to the community, the Xi'an RFC of 20 April 2026, sets six milestones, each paid at $50,000 in $XRD on the Radix Accountability Council's sign-off.
Neither repository recorded a commit this week. hyperscale-rs, at about 4,850 commits, was last pushed on 10 November (commit history), and Hyperscale Weekly #27 covered the week before.
What is built
- Consensus. Each shard orders its own transactions with a two-chain commit derived from HotStuff-2, and a transaction that touches several shards commits on all of them or on none, with no coordinator to fail.
- Milestone 1, validators and shards. A beacon chain assigns validators to shards, validators join and leave, and shards split and merge while they keep producing blocks. flightofthefox reported it complete on 7 August, except splitting a shard on fees as well as on storage, which waits on the new engine's fee system.
- Its own engine. hyperscale-vm replaced the Radix Engine in August, and on 16 August registered ML-DSA-65, a post-quantum signature scheme.
- Checks. Ten machine-checked models of the protocols, written in Quint and checked with Apalache, all passing, and a browser demo that runs the node's simulator as a network of several shards.
What is left
The RFC's other five milestones are API changes that align the engine with the Gateway, the service apps read the ledger through (Milestone 2, under way since August); a Gateway rewrite for sharded data; an alpha desktop validator for home hardware; post-quantum cryptography across the system; and the mainnet launch. On 8 November flightofthefox said the milestone view is out of date and named three streams of work, none of it public yet: a formal specification of the whole system, verified in Lean 4, a language for machine-checked proofs; a redesign that merges shard and beacon consensus into one model, prefix consensus over a DAG (directed acyclic graph); and the first desktop validator client, to prepare for the first testnets. No public testnet runs yet.
Time and money
In the hyperscale.rs channel on 19 November flightofthefox said that applying for further grants is not wanted, and that RDX never paid the share it had promised to match the Foundation's. Working full time rather than about 20 hours a week, flightofthefox said, is the difference between a test network in 3 months and in 15. Most of the work now goes into the specification, because a change such as moving to post-quantum cryptography touches almost every part of the system (Telegram).
at the moment i don't know what 2027 looks like so i don't give timelines
The week on the ledger
Read live from the Radix Gateway at epoch 360,640, state version 571,372,320, on 22 November 2026.
| Reading | Value | Week on week |
|---|---|---|
| Staked $XRD | 5.60bn | +22.2%, from 4.59bn |
| Share of supply staked | 41.3% | from 33.8% |
| Validators registered | 178 | no change |
| Fee changes queued | 3 | from 0 |
| Commits across tracked repositories | 0 | from 20 |
The ledger
- Miss: six or fewer validators hold a third of active stake by 22 November. The four weekly readings since the claim read 7, 7, 8 and 9.
- Still open: a winding-up order against RDX Works by 2 December. Companies House and the Gazette showed none on 22 November.
- Still open: voting for the Permanent RAC opens by 30 November. The list vote closes on 24 November; the candidate ballot can open after the 48-hour challenge window.
- New: RADIX FAM One charges 100% and both EasyStake validators charge 30% by 1 December. Settled by effective_fee_factor.current on each in the Gateway's validator list at or after epoch 362,878.
Every claim and its evidence: the Week in Review index.
This week on the wiki
The Radix Wallet article now covers what the Android update fixes and what an owner does after installing it, beside a table of each app's latest release that shows iOS still on 1.22.1. It is the page to send anyone who asks whether their wallet is affected.
Pages edited in the seven days to 2026-11-22:
Concentration watch
Nine validators hold a third of all staked $XRD, up from eight; a group holding a third can stall consensus. The largest ten hold 36.96%, down from 40.45%, because most of Gary's 1.37bn went to validators outside the ten.
Six of the validators that received it charge a 100% fee, the share of stakers' rewards a validator keeps: REDDICKS NODE, RADIX FAM 2, Leaf Node, RadixTalk, Delphinode and ADDIX+FOMO. The 420m staked with them earns Gary nothing. At the current emission of about 300m $XRD a year shared across 5.36bn of active stake (Network Emissions), it earns roughly 23m $XRD a year, all of it for those six operators. Three more that received 50m each have rises queued: RADIX FAM One from 6% to 100% around 29 November, and EasyStake-2 and EasyStake (SG) to 30% around 30 November (EasyStake-2's request, 16 November). Read from the Gateway's validator list at epoch 360,642, state version 571,373,464, and confirmed for REDDICKS NODE and RADIX FAM 2 on RadixScan.
What to watch
- 23 November: the council meets the Foundation on the asset handover. The RAC channel should report a schedule.
- 24 November, 22:13 UTC: Temperature Check 4 closes. Its page says whether the candidate election opens.
- 29 and 30 November: the three queued fee rises take effect at epochs 362,664 to 362,878. Each validator's effective fee on the Gateway settles it.
Everything else this week, in one place.
Protocol and tooling
Ecosystem and dApps
On the wiki
Next week the candidate list vote closes, and the election for seven seats could open on it.
Sources
- ↑ Ghenadie, urgent security update for Radix Wallet for Android, Radix DLT Telegram, 18 November 2026 ↗
- ↑ radixdlt/babylon-wallet-android, release 1.22.3, 17 November 2026 ↗
- ↑ radixdlt/babylon-wallet-android, pull request #1456 ↗
- ↑ radixdlt/sargon, release 1.2.61, 16 November 2026 ↗
- ↑ GenkiPool, Radix Connect over iroh test builds, Radix Developers Telegram, 18 November 2026 ↗
- ↑ GenkiPool, on holding the builds back, Radix Developers Telegram, 18 November 2026 ↗
- ↑ genkipool/radix-connect-iroh, GitHub ↗
- ↑ Radix DAO, Temperature Check 4, Permanent RAC candidate list ↗
- ↑ Radix Accountability Council, update of 19 November 2026, Telegram ↗
- ↑ Radix DAO, notice of non-elevation, Temperature Check 2, 13 November 2026 ↗
- ↑ The London Gazette, petition to wind up RDX Works, notice 5246445 ↗
- ↑ Companies House, RDX Works Ltd filing history ↗
- ↑ Gary, the seven OTC accounts, Radix DLT Telegram, 14 November 2026 ↗
- ↑ Gary, re-allocating stake, Radix DLT Telegram, 14 November 2026 ↗
- ↑ Radix Dashboard, 70m $XRD staked to REDDICKS NODE, 15 November 2026 ↗
- ↑ Radix Dashboard, EasyStake-2 fee change request, 16 November 2026 ↗
- ↑ Radix Fam, call for developers, Radix DLT Telegram, 21 November 2026 ↗
- ↑ hyperscalers/hyperscale-rs, commit history ↗
- ↑ Hyperscale Weekly #27, hyperscale.rs Telegram, 16 November 2026 ↗
- ↑ flightofthefox, on grants, hyperscale.rs Telegram, 19 November 2026 ↗
- ↑ flightofthefox, on hours and timelines, hyperscale.rs Telegram, 19 November 2026 ↗
- ↑ flightofthefox, on the specification, hyperscale.rs Telegram, 19 November 2026 ↗
- ↑ linuxx5046/babylon-rocksdb-tuning, GitHub ↗
- ↑ flightofthefox, Xi'an RFC: delivering Hyperscale for Radix, RadixTalk, 20 April 2026 ↗
- ↑ flightofthefox, Milestone 1 done, hyperscale.rs Telegram, 7 August 2026 ↗
- ↑ flightofthefox, three streams of work, hyperscale.rs Telegram, 8 November 2026 ↗
- ↑ hyperscalers/hyperscale-vm, ML-DSA-65 registered, 16 August 2026 ↗
- ↑ hyperscale.rs, live demo ↗
Radix Week in Review series, Issue #22: ← Previous: Issue #21, Nov 9–15, 2026 · All recaps · Subscribe
Previously: One account drained 1.32m $XRD from Radix DEX pools through two flaws, RDX sold 1.4bn $XRD over the counter, and 15 stood for the Permanent RAC.
